PROJECT RECAP

Level 99

West Hartford, CT

See the Photos

Job Description:

Project Scope:


Casey Electrical Services (CES) is preparing for the full electrical build-out of a new Level99 entertainment venue in West Hartford, CT. This new construction project will deliver a highly dynamic, experience-driven space requiring advanced electrical coordination, complex power distribution, and integrated life safety systems.


Level99 combines interactive challenge rooms, hospitality areas, bar service, and high-density occupancy spaces under one roof. CES will provide the complete electrical infrastructure for this ground-up build, ensuring the facility supports sophisticated lighting systems, specialty equipment loads, and a seamless guest experience.


Working alongside the general contractor and project stakeholders, CES will execute a comprehensive electrical installation designed to meet the operational demands of a large-scale entertainment venue while maintaining strict compliance with commercial building and safety codes.



Planned Installations and Upgrades:


Power Distribution & Electrical Infrastructure:


• Main Service & Switchgear Installation: Full service entrance equipment, switchgear, and distribution panels to support high-capacity entertainment and hospitality loads.

• Challenge Room Power Systems: Dedicated circuits and distribution for interactive rooms, specialty equipment, control systems, and audio/visual components.

• Bar & Hospitality Infrastructure: Power for kitchen equipment, refrigeration systems, POS stations, and beverage service areas.

• Equipment Coordination: Close collaboration with specialty vendors to ensure proper power delivery for proprietary Level99 systems.



Lighting Systems:


• Immersive Interior Lighting: Installation of performance-driven lighting systems designed to enhance interactive gaming environments.

• Architectural & Accent Lighting: Integrated lighting solutions to support brand aesthetics and atmosphere throughout the venue.

• Emergency & Egress Lighting: Code-compliant emergency systems to support high-occupancy safety requirements.

• Exterior & Entry Lighting: Safe and welcoming illuminated entry points and façade lighting.



Fire Alarm & Life Safety Systems:


• Full Fire Alarm Integration: Installation of detection, notification, and monitoring systems throughout all public and back-of-house areas.

• High-Occupancy Compliance: Systems designed and installed to meet assembly occupancy requirements and local regulations.

• Testing & Commissioning: Comprehensive testing, inspection, and certification prior to occupancy.



Project Timeline & Readiness:


• Location: West Hartford, CT

• Scope: Ground-up new construction electrical installation

• CES Role: Complete electrical infrastructure including service, distribution, lighting, and fire alarm systems

• Project Type: Large-scale entertainment and hospitality venue


At Casey Electrical Services, projects like Level99 demand precision coordination, advanced planning, and high-level execution. Our team is committed to delivering a reliable, high-performance electrical system that supports both the technical demands of interactive entertainment and the operational needs of a high-traffic hospitality environment.



Client: Level99

Type of Work: New Construction

Date Completed: 2026

Industry: Entertainment

Photo Gallery